A three–story reinforced concrete frame structure with a “Y” shaped plan view and 10m long beam spans. It covers a total area of 8,400m², including a 3,000m² basement. This building features the first application in Cyprus of a passive energy dissipation system, using the Scissor Jack viscous damper bracing assembly. This building represented Cyprus in the 2006 Ludwig von Misses Architectural awards.
The specific arrangement of the Scissor Jack device system in the COC building has been presented as an example by many academics in relevant conferences and seminars.
Olympic House and Park
: Cyprus Olympic Committee (COC) : Armon Choros Architektonikis : Nicosia, Cyprus : Buildings - Private Offices, Conference Hall - Advance Earthquake Engineering Solutions : Structural and Seismic (Dynamic & Time History) Analysis and Design, Advance Earthquake Engineering Solutions – use of Energy Dissipation Systems (Dampers with Scissor Jack Assembly), Structural Detailing and Specifications, Value Engineering and Site Supervision. : 2000 – 2002 : 2003 – 2006 / Completed : 10.107.990,00 Client Architect LocationProject Type Services Provided